Start with the specification, not the supplier list
Most sourcing problems begin before any supplier is contacted. The brief is a sentence, so every reply is priced against a different pack, and the comparison that follows is noise. Write down product dimensions, weight, structure preference, board grade, print colours, finishing, quantity, delivery country and target date before you open a directory.
If the structure itself is still open, our guide to choosing a packaging structure sets out the order of decisions and the numbers you need first.
Build a shortlist of four to six suppliers
Referrals from brands in a similar category remain the strongest source, because the reference has already paid for the mistakes. Trade fairs, industry associations and B2B directories can fill the rest of the list, but a directory entry is a claim rather than evidence. Verify the legal entity, the export record and the address before the first call.
Include both converters and trading companies at this stage. A converter runs printing, die-cutting or assembly in-house; a trading company coordinates factories. Each can be the right answer depending on volume, structure and how much coordination you want to own.
Ask the same five questions of every supplier
- Which operations are in-house: printing, die-cutting, assembly and packing?
- What is the minimum order quantity for this specification, and what drives it?
- What are the sample and production lead times at our quantity?
- Who owns the tooling, and is it charged once or amortised?
- Which Incoterm and which loading port do you quote?
The answers separate capability from marketing faster than a catalogue. A supplier that cannot say which step is subcontracted will struggle to explain a delay later.
Compare quotes that contain the same lines
Unit price alone misleads, because one quote may exclude tooling, another may assume flat-packed delivery, and a third may quote a lighter board. Ask for material, print, finishing, assembly, tooling and freight as separate lines. Our note on how a packaging quote is built explains what each line should contain, and cost per unit shows how quantity shifts the total.
Validate with a physical sample
Photos hide board caliper, wrap seams, magnet strength and the way a lid closes. A sample made with your artwork, at your dimensions, on the supplier's actual equipment is the cheapest test available. Check corners for gaps, colour against the approved reference, insert fit, and how the pack survives being opened twice. Record what you approved, because that sample becomes the reference for production.
Before the first order: eight checks
Business licence and export experience, factory address versus office address, capacity for your volume, quality process, tooling ownership, payment terms, export packing and references. The detailed list is in our supplier audit guide; treat it as the step after shortlisting, not a substitute for it.
Commercial terms worth settling early
- Payment schedule tied to sample approval and, where agreed, inspection.
- Tooling ownership, storage location and what happens if you move suppliers.
- Tolerance and acceptable defect level, agreed before production rather than after.
- Reorder terms and how long quoted prices stay valid.
- Confidentiality for original structures and artwork.
- The change process if quantity, artwork or delivery date moves.
Red flags that justify walking away
- A price far below the others with no explanation of what was removed.
- Refusal to answer process questions or share recent production photos or video.
- Tooling charged but ownership not granted in writing.
- Pressure for full prepayment before sampling.
- Lead times quoted before the specification has been read.
- Different answers to the same question across two emails.
Questions buyers ask
Is a trading company always a worse choice than a factory?
No. A competent trading partner manages several factories, consolidates orders and handles export documents, which can save coordination time. The risk is opacity about who actually produces the goods, so ask for factory disclosure before the first order.
How long should supplier selection take?
With a fixed specification, two to four weeks covers quotes, samples and a decision. Sampling typically takes seven to ten working days; first production typically twenty to twenty-five working days after approval.
Should we visit the factory before ordering?
A visit is valuable for large or recurring programmes and for any original structure. For a first small order, a sample plus a video call focused on the specific production line is often enough, provided the audit questions are answered in writing.