Printing, finishing and assembly under one roof.

Structural development, printing, surface finishing and hand assembly are handled by the same team. That shortens the loop between a problem on press and a decision on the box.

Packaging factory floor with box assembly lines in Dongguan

Factory overview

A workshop organised around the pack.

Work moves from prepress through printing, finishing, die cutting and box making, then into hand assembly and inspection. Each stage has its own check before the next one begins.

20

Years in packaging

12

Product categories

We publish only verified capabilities. Equipment models, floor area and daily capacity are shared during a project discussion rather than as marketing figures.

01

Prepress

Artwork checking, trapping, proofing and dieline preparation.

02

Offset Printing

CMYK and Pantone work on sheet-fed presses.

03

Die Cutting

Cutting and creasing to the approved structure.

04

Lamination

Matte, gloss and soft touch film applied for surface protection.

05

Foil Stamping

Hot foil in gold, silver and pigment colours.

06

Embossing

Raised and recessed detail for logo and pattern work.

07

Box Making

Greyboard wrapping, corner folding and magnet setting.

08

Hand Assembly

Ribbon, insert and closure assembly finished by hand.

09

Packaging Inspection

Final check, count and export carton packing.

Production gallery

From paper to finished pack.

Photography from the production floor. Each frame corresponds to a stage your job passes through.

Production detail
Prepress
01Prepress
Offset Printing
02Offset Printing
Die Cutting
03Die Cutting
Lamination
04Lamination
Foil Stamping
05Foil Stamping

Quality control

Four checks, in writing.

Inspection is scheduled at material intake, first-off production, during the run and before shipment. Any stage can hold the job if the standard is not met.

01

Incoming Material Inspection

Board caliper, paper weight and shade against the approved standard

02

First-Off Production Inspection

First printed sheet compared with the approved proof

03

In-Process Quality Control

Spot checks through printing, lamination, foil and die cutting

04

Final Pre-Shipment Inspection

AQL sampling across the finished batch

Minimum order

Around 1,000 pieces per style, depending on specification.

Sampling

Approximately 7–10 working days for standard projects.

Mass production

Approximately 20–25 working days after approval.

Payment terms

Deposit on order confirmation, balance before shipment.