Quality control
Quality is a schedule, not a promise.
Four inspection points sit inside the production schedule. Each has a written standard and the authority to stop the job until the issue is resolved.
01
Incoming Material Inspection

- Board caliper, paper weight and shade against the approved standard
- Moisture and flatness checked before material enters production
- Adhesive, foil and film batches logged by lot number
02
First-Off Production Inspection

- First printed sheet compared with the approved proof
- Colour density and Pantone match measured before the run continues
- Die cut position and crease quality confirmed on the first blanks
03
In-Process Quality Control

- Spot checks through printing, lamination, foil and die cutting
- Glue strength and wrap alignment checked during box making
- Hand assembly inspected for insert fit and lid clearance
04
Final Pre-Shipment Inspection

- AQL sampling across the finished batch
- Surface, print and structure checked under consistent lighting
- Export carton count, labelling and pallet condition verified
If something goes wrong
We stop the affected batch, document the issue and agree a remedy before continuing. If a problem is found after shipment, we review the inspection records with you rather than speculate.
What we measure
Colour against the approved proof, board caliper, die cut position, glue strength, surface condition and lid fit. Where a customer specifies a tolerance, it is written into the job ticket.
Inspection reports
Final inspection findings can be shared with the shipment documents on request, including photos of the packed cartons and the sampled units.