
Product 07
Corrugated Boxes
Corrugated packaging carries the product through the supply chain. The flute grade, board combination and print method are chosen together, because a box that looks right but crushes in transit is not a finished solution.
We produce printed corrugated for e-commerce, retail-ready and shipping use, with flexo or litho-laminated print depending on the artwork. Where the box doubles as the unboxing experience, we develop the inside print and insert at the same time as the outer.
At a glance
- Around 1,000 pcs per style
- Approx. 7–10 working days
- Approx. 20–25 working days
- 3 listed styles
Packaging styles
Corrugated Boxes structures.
Each structure changes how the pack opens, how it packs and what it costs. Open a style for the detail.
Specification options
What you can specify.
Options below are all produced in-house. The right combination depends on the product, the journey and the budget — we will say when a finish is not worth the cost.
Materials
- B-flute
- E-flute
- BC double wall
- Kraft liner
- White top liner
Printing
- Flexo
- Litho lamination
- Digital direct
Finishing
- Water-based coating
- Matte varnish
- Inside print
Insert options
- Corrugated fitment
- Molded pulp
- Paperboard divider
Structure notes
Board grade is confirmed against product weight and stacking plan before the print method is chosen.
Industry fit
Where this structure works.
The same box behaves differently across categories. These industry pages explain the considerations that usually come up.
Related projects
How this structure is used.
Typically around 1,000 pieces per style, depending on the box structure, materials and printing method. Smaller trial runs can sometimes be arranged for new projects after we review the specification.
Yes. Every structure is built to your product dimensions. We review the internal size, board thickness and clearance so the finished box holds your product correctly rather than simply matching the outside measurement.
Yes. A physical sample is produced for approval before production. The sample reflects the approved structure, material and finishes, and production starts only after you confirm it in writing.
Around 20–25 working days after sample approval. The final schedule depends on structure, materials, quantity and the production queue at the time of order confirmation.
Also consider




