
Product 03
Drawer Boxes
A drawer box is an outer sleeve with an inner tray that slides out, usually stopped by a ribbon, tab or magnet. The format works when the product should be revealed progressively rather than all at once.
Tolerance is the whole job here. A drawer that is too loose feels cheap; too tight and the customer has to force it. We control board thickness, wrap build and sleeve clearance together, then test the pull by hand on the sample.
At a glance
- Around 1,000 pcs per style
- Approx. 7–10 working days
- Approx. 20–25 working days
- 3 listed styles
Packaging styles
Drawer Boxes structures.
Each structure changes how the pack opens, how it packs and what it costs. Open a style for the detail.
Specification options
What you can specify.
Options below are all produced in-house. The right combination depends on the product, the journey and the budget — we will say when a finish is not worth the cost.
Materials
- Coated art paper
- Speciality paper
- Greyboard 1.5–2mm
- Kraft paper wrap
Printing
- Offset CMYK
- Pantone spot colour
Finishing
- Matte lamination
- Foil stamping
- Embossing
- Soft touch
Insert options
- EVA foam
- Paperboard platform
- Flocked tray
Structure notes
Sleeve and tray are made as separate runs, then matched and pull-tested before packing.
Industry fit
Where this structure works.
The same box behaves differently across categories. These industry pages explain the considerations that usually come up.
Related projects
How this structure is used.
Typically around 1,000 pieces per style, depending on the box structure, materials and printing method. Smaller trial runs can sometimes be arranged for new projects after we review the specification.
Yes. Every structure is built to your product dimensions. We review the internal size, board thickness and clearance so the finished box holds your product correctly rather than simply matching the outside measurement.
Yes. A physical sample is produced for approval before production. The sample reflects the approved structure, material and finishes, and production starts only after you confirm it in writing.
Around 20–25 working days after sample approval. The final schedule depends on structure, materials, quantity and the production queue at the time of order confirmation.
Also consider




