Custom Inserts manufactured by Brivote

Product 09

Custom Inserts

The insert decides whether the product sits exactly where the design intended. It also absorbs the movement that happens in transit, which is why we treat it as part of the structure rather than an accessory.

Material choice follows the product: foam for fragile or irregular shapes, molded pulp for a natural uncoated look, paperboard for light items where cost matters, and corrugated for heavier transit protection.

At a glance

Typical minimum
Around 1,000 pcs per style
Sampling
Approx. 7–10 working days
Production
Approx. 20–25 working days
Structures in this category
4 listed styles
Get a quote for Inserts

Specification options

What you can specify.

Options below are all produced in-house. The right combination depends on the product, the journey and the budget — we will say when a finish is not worth the cost.

Materials

  • EVA foam
  • EPE foam
  • Molded pulp
  • Paperboard
  • Corrugated board

Printing

  • Plain
  • Printed wrap
  • Fabric lamination

Finishing

  • Fabric lamination
  • Flocking
  • Uncoated fibre

Insert options

  • Fabric cover
  • Ribbon pull
  • Finger notch

Structure notes

We cut the insert from a product sample or accurate 3D file, then test fit before the outer box is approved.

FAQ

Custom Inserts questions.

Typically around 1,000 pieces per style, depending on the box structure, materials and printing method. Smaller trial runs can sometimes be arranged for new projects after we review the specification.

Yes. Every structure is built to your product dimensions. We review the internal size, board thickness and clearance so the finished box holds your product correctly rather than simply matching the outside measurement.

Yes. A physical sample is produced for approval before production. The sample reflects the approved structure, material and finishes, and production starts only after you confirm it in writing.

Around 20–25 working days after sample approval. The final schedule depends on structure, materials, quantity and the production queue at the time of order confirmation.

Also consider